English

ہوم / مشق / اے سی سی اے / اسٹریٹجک پروفیشنل لیول میں نیا / SDS Problem identification and data readiness

SDS Problem identification and data readiness

Written by Saad Rahman (ACCA)

7 سوالات: اے سی سی اے اسٹریٹجک پروفیشنل لیول میں نیا، جوابات اور وضاحت کے ساتھ۔

جوابی کنجی کے ساتھ قابلِ پرنٹ ورک شیٹ

تمام سوالات جوابات کے ساتھ
  1. In a data science project, the first stage of CRISP-ML is:

    • 1 Monitoring
    • 2 Business and data understanding
    • 3 Deployment
    • 4 Modelling
    جواب دیکھیں

    درست جواب: Business and data understanding

    The project starts by defining the problem and checking whether suitable data exists.

    غلطی کی اطلاع دیں

  2. Which statement describes a well-scoped data science problem?

    • 1 It starts with the choice of algorithm
    • 2 It has no stakeholders
    • 3 It states a specific decision, a measure of success and the data available
    • 4 It says 'use AI to improve results'
    جواب دیکھیں

    درست جواب: It states a specific decision, a measure of success and the data available

    A well-scoped problem links to value and can be measured.

    غلطی کی اطلاع دیں

  3. A data quality audit would check completeness, accuracy, consistency and:

    • 1 The server brand
    • 2 The number of users
    • 3 Timeliness and validity
    • 4 The colour of the charts
    جواب دیکھیں

    درست جواب: Timeliness and validity

    These are standard dimensions of data quality, and uniqueness is also commonly tested.

    غلطی کی اطلاع دیں

  4. A model is built on five years of customer data collected only from branch customers, and will be used for online customers. The main concern is:

    • 1 The model is too fast
    • 2 The users are too many
    • 3 The data may not be representative
    • 4 The data is too clean
    جواب دیکھیں

    درست جواب: The data may not be representative

    Models perform poorly when training data differs from the population to which it is applied.

    غلطی کی اطلاع دیں

  5. A deployed model's accuracy falls over time because customer behaviour has changed. This is called:

    • 1 Underfitting
    • 2 Data leakage
    • 3 Model drift
    • 4 Overfitting
    جواب دیکھیں

    درست جواب: Model drift

    Models need monitoring and maintenance after deployment.

    غلطی کی اطلاع دیں

  6. Early stakeholder engagement in a data science project is important mainly because it:

    • 1 Reduces the need for data
    • 2 Allows the team to avoid documentation
    • 3 Ensures that the work addresses a real need and increases the chance the result is used
    • 4 Avoids all risk
    جواب دیکھیں

    درست جواب: Ensures that the work addresses a real need and increases the chance the result is used

    Poor engagement leads to models that are never adopted.

    غلطی کی اطلاع دیں

  7. Which of these is a data preparation task?

    • 1 Handling missing values and encoding categories
    • 2 Presenting results to the board
    • 3 Monitoring drift
    • 4 Agreeing the problem
    جواب دیکھیں

    درست جواب: Handling missing values and encoding categories

    Preparation makes the data suitable for modelling.

    غلطی کی اطلاع دیں

اسٹریٹجک پروفیشنل لیول میں نیا کے مزید موضوعات