  1. Setup costs are $60,000 for 100 setups. A product needs 30 setups. What setup cost is charged to the product?

    • A $18,000
    • B $2,000
    • C $18
    • D $60,000
  2. Which statement about ABC is correct?

    • A It ignores overheads
    • B It uses one overhead rate for the whole factory
    • C It is quicker and cheaper to set up than absorption costing
    • D It assigns overheads to products using the activities that cause the costs
  3. The market will pay $50 and the required margin is 20 percent of the selling price. What is the target cost?

    • A $30
    • B $10
    • C $40
    • D $60
  4. Why does life-cycle costing matter for design decisions?

    • A It ignores costs after the sale
    • B Many of a product's costs are committed at the design stage
    • C It only measures production costs
    • D Design costs are not important
  5. In throughput accounting, throughput is:

    • A Sales revenue less labour cost
    • B The number of units produced
    • C Sales revenue less all costs
    • D Sales revenue less direct material cost
  6. A product earns a return per bottleneck hour of $50. The cost per factory hour is $30. What is the throughput accounting ratio?

    • A 0.60
    • B 1.67
    • C 1.00
    • D 20.00
  7. A throughput accounting ratio below 1 for a product means that:

    • A The product earns less from the bottleneck than the cost of using it
    • B The product is the most profitable
    • C The product has no direct materials
    • D There is no bottleneck
  8. Which technique tracks the flow of materials and the cost of waste through a process?

    • A Flow cost accounting
    • B Zero-based budgeting
    • C Cost-plus pricing
    • D Target costing
  9. A cost driver is:

    • A The factor that causes the cost of an activity to change
    • B The total overhead cost
    • C The selling price
    • D The cost of direct materials

جوابی کلید

1. A, 2. D, 3. C, 4. B, 5. D, 6. B, 7. A, 8. A, 9. A

  1. Cost per setup = $600. 30 x $600 = $18,000.

  2. ABC uses cost drivers for each cost pool.

  3. Target cost = price less the required profit = 50 - 10.

  4. Decisions made during design lock in most of the product's later costs.

  5. Labour and overheads are treated as fixed factory costs.

  6. Ratio = return per factory hour / cost per factory hour = 50 / 30.

  7. A ratio below 1 is a warning sign.

  8. Flow cost accounting is an environmental management accounting technique.

  9. Examples are the number of setups or inspections.