Home / NEBOSH IGC / Scenario practice / Museum exhibition installation incident
8 study tasks, 100 available practice points. 8 management-focus, 0 technical and 0 cross-unit tasks.
Official assessment guidance checked November 14, 2026:
You advise a town museum with 28 employees and 16 regular volunteers. It opens six days a week and receives school groups as well as individual visitors. Curators select exhibitions, the facilities supervisor organises building work, and the visitor-services team controls public access. A director has overall responsibility. A new exhibition is due to open on Saturday, and advance tickets have already been sold.
Three weeks before opening, the curator changes the design to include taller freestanding display panels. The original installation plan covered low display cases. The facilities supervisor is away for a week, and the director tells the curator to keep the opening date. No replacement coordinator is appointed. Painting, lighting work and panel installation are booked into the same gallery on Thursday.
The installation contractor has made attractive displays for another museum. The curator selects it from photographs and a price quotation. Nobody asks how the contractor will keep the tall panels stable during assembly or separate its work from other people. Its work plan arrives on Thursday afternoon, after installation has started. The museum has not agreed who will check the gallery before it is reopened.
The contractor temporarily supports unfinished panels with loose props. On Thursday afternoon, a volunteer moves a barrier to take a school group through the gallery because the usual route is blocked by stored display cases. There is no formal handover between the contractor and visitor services. The group passes close to the unfinished panels while workers carry materials across the route.
On Wednesday, a volunteer emailed the curator that a trial panel swayed when touched. The email asked for a check before anybody worked beside it. The curator replied that the contractor was experienced and that the opening could not be delayed. The volunteer does not receive an explanation of any corrective action and is reluctant to raise the concern again.
Two temporary gallery assistants begin work on Thursday. Their induction consists of a leaflet about opening hours and customer service. They are not shown the work area or told who may authorise barrier changes. Volunteers hear about the exhibition change through informal conversations. The safety committee has not met for six months, and some staff say raising a concern is seen as being unhelpful.
The delivery entrance, temporary materials store and visitor route meet at a narrow doorway. Contractors push loaded trolleys through it while staff carry labels and equipment in the opposite direction. A visitor-services assistant has asked for delivery times to be separated from school-group access, but no schedule has been agreed. No injury at this doorway has been reported.
Later on Thursday, a volunteer walks beside an unfinished panel to collect labels. The panel tips and strikes the volunteer, who suffers a wrist fracture. A trained first aider attends, the emergency services are called and the gallery is closed. Nobody else enters the installation area. The contractor secures the remaining area pending a competent assessment. The museum records the incident and keeps the relevant work documents.
The museum’s risk assessment is two years old and describes routine public visits and low display cases. It does not consider the taller panels, simultaneous contractor work or temporary gallery assistants. No one has recorded a review following the design change. The director says the injured volunteer should have paid more attention and asks for a reminder notice to be issued.
The policy assigns building work to the facilities supervisor but does not say who takes over during absence or who accepts a completed gallery for public use. The director receives monthly visitor totals and ticket income. Safety reports show only employee injuries, leaving out volunteer incidents and near misses. The director has not checked whether previously assigned actions were completed.
Illustrative extract from the museum’s records.
| Event | Recorded response | Outstanding question |
|---|---|---|
| Panel design changed three weeks before opening | Opening date retained | Who reviewed the changed work? |
| Facilities supervisor absent | No replacement named | Who coordinates the contractors? |
| Wednesday: trial panel sways | Contractor described as experienced | Was stability checked? |
| Thursday: doorway conflict raised | No schedule agreed | When may visitors and deliveries pass? |
GIC1 management focus. Related syllabus: 3.5 Management of change.
Explain how the museum should have managed the change from low display cases to taller panels. (12)
Note: Support your answer with relevant scenario evidence. Distinguish case facts from proposed improvements.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Practice points counted: 0 of 12
GIC1 management focus. Related syllabus: 1.3 Who does what in organisations.
Comment on the contractor-management weaknesses and explain appropriate improvements. (14)
Note: Support your answer with relevant scenario evidence. Distinguish case facts from proposed improvements.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Practice points counted: 0 of 14
Original teaching extracts for this task, not a complete 14-point answer or an official mark scheme. No marks are awarded to these extracts. Read the task note before using the evidence.
The contractor should be careful, wear PPE and sign a form. It has done museum work before so it can manage the job.
The curator selected the contractor from photographs and a quotation without asking how tall panels would remain stable. Check competence and task-specific planning for the actual installation before authorising work.
Why this is stronger: Connects selection evidence to the capability and planning that were not checked.
Nobody asks how the contractor will keep the tall panels stable
Painting, lighting and installation were booked into one gallery while the facilities supervisor was away. Appoint an authorised coordinator and agree interfaces, access restrictions and communication between the trades and museum teams.
Why this is stronger: Addresses the museum’s coordination responsibility rather than transferring everything to the contractor.
No replacement coordinator is appointed
There was no formal handover before a volunteer moved the barrier for a school group. Define who can accept the installation and reopen the gallery, with the required checks completed before visitors enter.
Why this is stronger: Explains why a clear acceptance decision is needed; a signature alone cannot establish that the panels are safe.
There is no formal handover between the contractor and visitor services
Develop other distinct contractor-management points using the late work plan, the warning email and delivery-route conflict. The extracts illustrate reasoning and carry no awarded marks.
Control principles checked November 14, 2026. These are educational explanations, not operating instructions; apply competent site-specific assessment and local duties.
GIC1 management focus. Related syllabus: 3.1 Health and safety culture.
Use the case to explain indicators of a weak safety culture. (12)
Note: Support your answer with relevant scenario evidence. Distinguish case facts from proposed improvements.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Practice points counted: 0 of 12
GIC1 management focus. Related syllabus: 3.4 Assessing risk.
Explain what a suitable review of the gallery work assessment should address. (14)
Note: Support your answer with relevant scenario evidence. Distinguish case facts from proposed improvements.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Practice points counted: 0 of 14
GIC1 management focus. Related syllabus: 4.1 Investigating and reporting incidents.
Explain the evidence to collect and how it could help identify causes of the panel incident. (14)
Note: Support your answer with relevant scenario evidence. Distinguish case facts from proposed improvements.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Practice points counted: 0 of 14
GIC1 management focus. Related syllabus: 3.2 Improving health and safety culture.
Explain how the museum could improve communication and involvement during exhibition changes. (10)
Note: Support your answer with relevant scenario evidence. Distinguish case facts from proposed improvements.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Practice points counted: 0 of 10
GIC1 management focus. Related syllabus: 4.2 Active and reactive monitoring.
Recommend useful active and reactive monitoring for the museum, explaining what each would show. (12)
Note: Support your answer with relevant scenario evidence. Distinguish case facts from proposed improvements.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Practice points counted: 0 of 12
GIC1 management focus. Related syllabus: 2.2 Key components of a health and safety policy; 4.4 Review of health and safety performance.
Explain what the director should change in responsibilities and review arrangements. (12)
Note: Support your answer with relevant scenario evidence. Distinguish case facts from proposed improvements.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Practice points counted: 0 of 12
Practice points counted across all tasks: 0 of 100. This teaching set is not a scored GIC1 mock or a GIC2 assessment.