8 study tasks, 100 available practice points. 7 management-focus, 0 technical and 1 cross-unit tasks.
How to use this practice
This is original teaching material, not a NEBOSH paper or a complete mock examination. Checklist counts are this site's practice points, not an examiner's mark or a pass prediction.
GIC1 focuses on management of health and safety. Technical knowledge from Elements 5 to 11 is assessed through GIC2. Some management skills also support GIC2. Our task labels and related syllabus references are study mappings by this site, not NEBOSH approval.
GIC2 is a practical assessment of your own workplace. The technical and cross-unit written tasks here build application skills; they are not a GIC2 submission template.
For GIC1, use the task note to decide which evidence is required. Develop distinct technical points and explain why the facts matter; generic lists, repeated ideas and copied facts without explanation do not demonstrate the same understanding.
Write your answer in the box under each task. Your text stays in this browser. Afterwards, open the marking points and tick the unique points your answer made.
You are a health and safety adviser who has just joined Zameen Steel Rolling Mill (Zameen), a re-rolling mill that heats steel billets in a furnace and rolls them into reinforcing bars. Zameen has 320 employees on three shifts and uses contractors for repairs. The plant manager (PM) leads the site. A production manager (PrM) and a maintenance manager (MM) report to the PM. Billets are loaded onto the furnace by a hydraulic pusher, and the furnace runs for most of the year at over 1,000 °C. Noise levels in the mill are high, and workers wear earplugs.
The directors set output targets every month and the PM is paid a bonus when they are met. Production workers are paid a small bonus per tonne. Shifts last 12 hours, and overtime is common. The PM tells managers that a stopped furnace or rolling line costs the mill thousands of dollars an hour, so stoppages must be short. The maintenance budget has been cut by a quarter in the last two years.
Zameen has a short health and safety policy signed by the PM six years ago. It says that safety is important and that everyone is responsible. It does not say who is responsible for what, and it has not been reviewed. There is one safety officer, who also runs training and the canteen. The mill has a written rule that machines must be isolated before repair, but there is no permit to work system and no lock-out equipment. Supervisors say that isolation is the job of the fitter, and fitters say that it is the job of the operator.
Eight weeks ago the mill chose Alpha Engineering (Alpha), a small repair firm, to service the hydraulic system of the pusher. Alpha offered a price a third lower than the other firms. The mill did not ask for its accident record, training records or method statement. Alpha's fitters had no induction because the PrM said that they only needed to be on site for a day. The fitters were not told about the 12 hour shifts and the other work going on near the furnace. Nobody from the mill was named to supervise the work.
During the previous month the pusher moved unexpectedly twice when an operator pressed the start button by mistake. These events were noted in the night shift log, but nobody reviewed it. The control panel for the pusher has no cover and no lock. The pusher has a trip bar, but it was removed last year because it caused false stops. Lighting around the pusher is poor, and signs are faded. Safety meetings are held every quarter and supervisors seldom attend.
The mill has first aid boxes and one trained first aider on the day shift. At night the security guard is the only person who holds a first aid certificate, and the certificate has expired. The emergency plan was written for day working. A hospital is 30 minutes away by road, and the mill does not have its own ambulance. No emergency drill has been held in the last two years. Workers say that new staff are not told what to do in an emergency.
The incident
At 03:30 on a Thursday, during a night shift in a planned two hour stoppage, a fitter from Alpha was sent to repair a leaking hydraulic hose at the charging end of the pusher. He had been in the mill for three hours and had not been to the mill before. No permit was issued. The pusher was not isolated and the hydraulic pressure was not released. He reached into the pusher to loosen the hose, and the only warning he was given was an instruction from a supervisor to be quick. The pusher operator had been at work for 11 hours and knew that the stoppage was almost over. He did not know that the fitter was at the pusher, and the fitter could not be seen from the control panel. He started the pusher to bring it into position. The pusher moved and trapped the fitter's right arm and shoulder against the charging table. A colleague found him and shouted for help, but no one nearby knew how to stop the machine quickly. The night security guard came with a first aid box, but no trained person was available, and an ambulance was called. It arrived 50 minutes after the call and the fitter was taken to hospital, where his arm was amputated. The PM says that the fitter was careless and has asked you to prepare a report.
Supporting document 1: Maintenance and contractor log, last three months (extract)
Kept by the maintenance office. Reviewed by: nobody recorded.
Month
Job
Who did it
Notes
Month 1
Replace pusher hose
Mill fitter
Machine stopped, no isolation, no permit
Month 1
Pusher moved by mistake during cleaning
Night shift operator
Noted in the shift log. No action taken
Month 2
Weld repair on the cooling water pipe
Contractor
Done without a hot work check. Small fire put out by workers
Month 2
Pusher moved again by mistake
Night shift operator
Noted in the shift log. Trip bar removed last year
Explain how a permit to work and a lock-out system could have prevented this incident, and what a permit should contain. (12)
Note: You should support your answer using relevant information from the scenario.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Practice points counted: 0 of 12
Compare weak and stronger answer extracts for task 1
Original teaching extracts for this task, not a complete 12-point answer or an official mark scheme. No marks are awarded to these extracts. Read the task note before using the evidence.
Weak extract
The fitter should have used a permit and locked the machine. This would have prevented the accident.
Why it is weak
The claim guarantees an outcome from paperwork and a lock without specifying what hazards must be controlled.
It does not explain the actual shared-responsibility or communication failures.
Stronger extract with annotations
Developed point 1
The pusher was not isolated and hydraulic pressure was not released before the fitter reached in. A competent safe system must address all hazardous energy and possible movement, with isolation verified before access; a stopped production period is not enough.
Why this is stronger: Links the control principle to the actual energy hazard without providing a do-it-yourself hydraulic isolation sequence.
Supervisors thought isolation belonged to the fitter while fitters thought it belonged to the operator. The permit arrangements should assign and communicate who establishes and verifies the precautions, so that neither group assumes the other has acted.
Why this is stronger: Explains the organisational function of the permit using the stated responsibility gap.
The operator did not know the fitter was at the pusher and could not see him. The work authorisation and controlled hand-back need to communicate equipment status to everyone who might restart it; a warning to the fitter to hurry does not do that.
Why this is stronger: Develops communication/restart control from the incident facts, without promising a permit alone guarantees safety.
Continue with authorisation, work boundaries, validity, verification and hand-back. Do not use this extract as a machinery isolation or testing procedure.
Control principles checked November 14, 2026. These are educational explanations, not operating instructions; apply competent site-specific assessment and local duties.
Outline the weaknesses in the health and safety policy and the arrangements of Zameen, and the responsibilities of directors, managers, supervisors and workers. (10)
Note: You should support your answer using relevant information from the scenario.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.
Describe the weaknesses in the emergency arrangements of Zameen and the arrangements that it should have in place for a serious injury in the mill. (14)
Note: You should support your answer using relevant information from the scenario.
0 words
Tick each point that your answer made clearly and only once. Points here are this site's own. A real examiner may accept other valid points.