Steel rolling mill pusher incident

Written by Imran Qureshi (NEBOSH)

8 study tasks, 100 available practice points. 7 management-focus, 0 technical and 1 cross-unit tasks.

How to use this practice

Official assessment guidance checked November 14, 2026:

Scenario

You are a health and safety adviser who has just joined Zameen Steel Rolling Mill (Zameen), a re-rolling mill that heats steel billets in a furnace and rolls them into reinforcing bars. Zameen has 320 employees on three shifts and uses contractors for repairs. The plant manager (PM) leads the site. A production manager (PrM) and a maintenance manager (MM) report to the PM. Billets are loaded onto the furnace by a hydraulic pusher, and the furnace runs for most of the year at over 1,000 °C. Noise levels in the mill are high, and workers wear earplugs.

The directors set output targets every month and the PM is paid a bonus when they are met. Production workers are paid a small bonus per tonne. Shifts last 12 hours, and overtime is common. The PM tells managers that a stopped furnace or rolling line costs the mill thousands of dollars an hour, so stoppages must be short. The maintenance budget has been cut by a quarter in the last two years.

Zameen has a short health and safety policy signed by the PM six years ago. It says that safety is important and that everyone is responsible. It does not say who is responsible for what, and it has not been reviewed. There is one safety officer, who also runs training and the canteen. The mill has a written rule that machines must be isolated before repair, but there is no permit to work system and no lock-out equipment. Supervisors say that isolation is the job of the fitter, and fitters say that it is the job of the operator.

Eight weeks ago the mill chose Alpha Engineering (Alpha), a small repair firm, to service the hydraulic system of the pusher. Alpha offered a price a third lower than the other firms. The mill did not ask for its accident record, training records or method statement. Alpha's fitters had no induction because the PrM said that they only needed to be on site for a day. The fitters were not told about the 12 hour shifts and the other work going on near the furnace. Nobody from the mill was named to supervise the work.

During the previous month the pusher moved unexpectedly twice when an operator pressed the start button by mistake. These events were noted in the night shift log, but nobody reviewed it. The control panel for the pusher has no cover and no lock. The pusher has a trip bar, but it was removed last year because it caused false stops. Lighting around the pusher is poor, and signs are faded. Safety meetings are held every quarter and supervisors seldom attend.

The mill has first aid boxes and one trained first aider on the day shift. At night the security guard is the only person who holds a first aid certificate, and the certificate has expired. The emergency plan was written for day working. A hospital is 30 minutes away by road, and the mill does not have its own ambulance. No emergency drill has been held in the last two years. Workers say that new staff are not told what to do in an emergency.

The incident

At 03:30 on a Thursday, during a night shift in a planned two hour stoppage, a fitter from Alpha was sent to repair a leaking hydraulic hose at the charging end of the pusher. He had been in the mill for three hours and had not been to the mill before. No permit was issued. The pusher was not isolated and the hydraulic pressure was not released. He reached into the pusher to loosen the hose, and the only warning he was given was an instruction from a supervisor to be quick. The pusher operator had been at work for 11 hours and knew that the stoppage was almost over. He did not know that the fitter was at the pusher, and the fitter could not be seen from the control panel. He started the pusher to bring it into position. The pusher moved and trapped the fitter's right arm and shoulder against the charging table. A colleague found him and shouted for help, but no one nearby knew how to stop the machine quickly. The night security guard came with a first aid box, but no trained person was available, and an ambulance was called. It arrived 50 minutes after the call and the fitter was taken to hospital, where his arm was amputated. The PM says that the fitter was careless and has asked you to prepare a report.

Supporting document 1: Maintenance and contractor log, last three months (extract)

Kept by the maintenance office. Reviewed by: nobody recorded.

MonthJobWho did itNotes
Month 1Replace pusher hoseMill fitterMachine stopped, no isolation, no permit
Month 1Pusher moved by mistake during cleaningNight shift operatorNoted in the shift log. No action taken
Month 2Weld repair on the cooling water pipeContractorDone without a hot work check. Small fire put out by workers
Month 2Pusher moved again by mistakeNight shift operatorNoted in the shift log. Trip bar removed last year
Month 3Service of the pusher hydraulics bookedAlpha EngineeringChosen on price, no records requested
Month 3Fitter trapped by the pusherAlpha EngineeringIncident, see report
Task 1: Isolation and permit to work

GIC1 + GIC2 cross-unit application. Related syllabus: 3.7 Permit to work systems; 9.1 General requirements; 9.3 Machinery hazards.

Explain how a permit to work and a lock-out system could have prevented this incident, and what a permit should contain. (12)

Note: You should support your answer using relevant information from the scenario.

0 words

Compare weak and stronger answer extracts for task 1

Original teaching extracts for this task, not a complete 12-point answer or an official mark scheme. No marks are awarded to these extracts. Read the task note before using the evidence.

Weak extract

The fitter should have used a permit and locked the machine. This would have prevented the accident.

Why it is weak

  • The claim guarantees an outcome from paperwork and a lock without specifying what hazards must be controlled.
  • It does not explain the actual shared-responsibility or communication failures.

Stronger extract with annotations

Developed point 1

The pusher was not isolated and hydraulic pressure was not released before the fitter reached in. A competent safe system must address all hazardous energy and possible movement, with isolation verified before access; a stopped production period is not enough.

Why this is stronger: Links the control principle to the actual energy hazard without providing a do-it-yourself hydraulic isolation sequence.

Developed point 2

Supervisors thought isolation belonged to the fitter while fitters thought it belonged to the operator. The permit arrangements should assign and communicate who establishes and verifies the precautions, so that neither group assumes the other has acted.

Why this is stronger: Explains the organisational function of the permit using the stated responsibility gap.

Developed point 3

The operator did not know the fitter was at the pusher and could not see him. The work authorisation and controlled hand-back need to communicate equipment status to everyone who might restart it; a warning to the fitter to hurry does not do that.

Why this is stronger: Develops communication/restart control from the incident facts, without promising a permit alone guarantees safety.

Develop the rest of your answer

Continue with authorisation, work boundaries, validity, verification and hand-back. Do not use this extract as a machinery isolation or testing procedure.

Control principles checked November 14, 2026. These are educational explanations, not operating instructions; apply competent site-specific assessment and local duties.

Task 2: Contractor management

GIC1 management focus. Related syllabus: 1.3 Who does what in organisations.

Outline the actions that Zameen should have taken to select, control and review the work of Alpha Engineering. (12)

Note: You should support your answer using relevant information from the scenario.

0 words

Task 3: Human factors

GIC1 management focus. Related syllabus: 3.3 How human factors influence behaviour.

Describe the organisational, job and individual factors that are likely to have contributed to the incident. (12)

Note: You should support your answer using relevant information from the scenario.

0 words

Task 4: Policy and responsibilities

GIC1 management focus. Related syllabus: 2.2 Key components of a health and safety policy; 1.3 Who does what in organisations.

Outline the weaknesses in the health and safety policy and the arrangements of Zameen, and the responsibilities of directors, managers, supervisors and workers. (10)

Note: You should support your answer using relevant information from the scenario.

0 words

Task 5: Monitoring

GIC1 management focus. Related syllabus: 4.1 Investigating and reporting incidents; 4.2 Active and reactive monitoring.

Explain how Zameen should monitor its health and safety performance, and the weaknesses in its present monitoring. (14)

Note: You should support your answer using relevant information from the scenario.

0 words

Task 6: Incident investigation

GIC1 management focus. Related syllabus: 4.1 Investigating and reporting incidents.

Outline how Zameen should investigate the incident, and the benefits of doing so. (14)

Note: You should support your answer using relevant information from the scenario.

0 words

Task 7: Emergency arrangements

GIC1 management focus. Related syllabus: 3.8 Emergency procedures.

Describe the weaknesses in the emergency arrangements of Zameen and the arrangements that it should have in place for a serious injury in the mill. (14)

Note: You should support your answer using relevant information from the scenario.

0 words

Task 8: The case for health and safety

GIC1 management focus. Related syllabus: 1.1 Morals and money; 1.2 Regulating health and safety.

Explain the moral, legal and financial reasons for Zameen to improve its management of health and safety, using the incident as an example. (12)

Note: You should support your answer using relevant information from the scenario.

0 words

Practice points counted across all tasks: 0 of 100. This teaching set is not a scored GIC1 mock or a GIC2 assessment.