اے سی سی اے · ایکسپرٹیز لیول میں نیا · 8 سوالات
نام: ____________________ تاریخ: ____________
Which is a prevention cost in the cost of quality?
Customer returns and warranty claims are:
Scrap and rework found before delivery are:
The potential cost of cleaning up contamination in the future is an environmental cost of which category?
Waste disposal costs that are included in general overheads are:
The Theory of Constraints says that output is limited by:
Maximise 5x + 4y with machine time 2x + y <= 100 and labour x + 2y <= 80. What is the maximum contribution?
In the same problem (maximise 5x + 4y with 2x + y <= 100 and x + 2y <= 80), what is the shadow price of a machine hour?
1. A, 2. D, 3. C, 4. D, 5. C, 6. A, 7. C, 8. B
Prevention costs stop defects occurring.
They arise after delivery.
They arise before the product reaches the customer.
Contingent costs may arise in the future.
They are not separately identified.
Effort should focus on the bottleneck.
The optimum is x = 40, y = 20: 200 + 80.
Solving 2a + b = 5 and a + 2b = 4 gives a = 2 and b = 1.