E5 Cost analysis, constraints and sustainability

Written by Saad Rahman (ACCA)

8 سوالات: اے سی سی اے ایکسپرٹیز لیول میں نیا، جوابات اور وضاحت کے ساتھ۔

جوابی کنجی کے ساتھ قابلِ پرنٹ ورک شیٹ

تمام سوالات جوابات کے ساتھ
  1. Which is a prevention cost in the cost of quality?

    • 1 Staff training in quality
    • 2 Warranty claims
    • 3 Scrap
    • 4 Final inspection
    جواب دیکھیں

    درست جواب: Staff training in quality

    Prevention costs stop defects occurring.

    غلطی کی اطلاع دیں

  2. Customer returns and warranty claims are:

    • 1 Internal failure costs
    • 2 Prevention costs
    • 3 Appraisal costs
    • 4 External failure costs
    جواب دیکھیں

    درست جواب: External failure costs

    They arise after delivery.

    غلطی کی اطلاع دیں

  3. Scrap and rework found before delivery are:

    • 1 Environmental costs
    • 2 Prevention costs
    • 3 Internal failure costs
    • 4 External failure costs
    جواب دیکھیں

    درست جواب: Internal failure costs

    They arise before the product reaches the customer.

    غلطی کی اطلاع دیں

  4. The potential cost of cleaning up contamination in the future is an environmental cost of which category?

    • 1 Conventional
    • 2 Hidden
    • 3 Reputational
    • 4 Contingent
    جواب دیکھیں

    درست جواب: Contingent

    Contingent costs may arise in the future.

    غلطی کی اطلاع دیں

  5. Waste disposal costs that are included in general overheads are:

    • 1 Contingent costs
    • 2 Reputational costs
    • 3 Hidden environmental costs
    • 4 Conventional costs
    جواب دیکھیں

    درست جواب: Hidden environmental costs

    They are not separately identified.

    غلطی کی اطلاع دیں

  6. The Theory of Constraints says that output is limited by:

    • 1 The bottleneck
    • 2 The number of products
    • 3 The largest customer
    • 4 The cheapest resource
    جواب دیکھیں

    درست جواب: The bottleneck

    Effort should focus on the bottleneck.

    غلطی کی اطلاع دیں

  7. Maximise 5x + 4y with machine time 2x + y <= 100 and labour x + 2y <= 80. What is the maximum contribution?

    • 1 $300
    • 2 $250
    • 3 $280
    • 4 $160
    جواب دیکھیں

    درست جواب: $280

    The optimum is x = 40, y = 20: 200 + 80.

    غلطی کی اطلاع دیں

  8. In the same problem (maximise 5x + 4y with 2x + y <= 100 and x + 2y <= 80), what is the shadow price of a machine hour?

    • 1 $4
    • 2 $2
    • 3 $1
    • 4 $5
    جواب دیکھیں

    درست جواب: $2

    Solving 2a + b = 5 and a + 2b = 4 gives a = 2 and b = 1.

    غلطی کی اطلاع دیں