9 ACCA Performance Management questions with answers and explanations.
Printable worksheet with answer key
Setup costs are $60,000 for 100 setups. A product needs 30 setups. What setup cost is charged to the product?
Which statement about ABC is correct?
Correct answer: It assigns overheads to products using the activities that cause the costs
ABC uses cost drivers for each cost pool.
The market will pay $50 and the required margin is 20 percent of the selling price. What is the target cost?
Correct answer: $40
Target cost = price less the required profit = 50 - 10.
Why does life-cycle costing matter for design decisions?
Correct answer: Many of a product's costs are committed at the design stage
Decisions made during design lock in most of the product's later costs.
In throughput accounting, throughput is:
Correct answer: Sales revenue less direct material cost
Labour and overheads are treated as fixed factory costs.
A product earns a return per bottleneck hour of $50. The cost per factory hour is $30. What is the throughput accounting ratio?
Correct answer: 1.67
Ratio = return per factory hour / cost per factory hour = 50 / 30.
A throughput accounting ratio below 1 for a product means that:
Correct answer: The product earns less from the bottleneck than the cost of using it
A ratio below 1 is a warning sign.
Which technique tracks the flow of materials and the cost of waste through a process?
Correct answer: Flow cost accounting
Flow cost accounting is an environmental management accounting technique.
A cost driver is:
Correct answer: The factor that causes the cost of an activity to change
Examples are the number of setups or inspections.