Unit GIC2 · Element 11: Electricity
11.2 Control Measures
Pages in this chapter (6 of 9)

Use of a safe system of work

Restriction of live working

Work dead is the normal approach. In Great Britain, Regulation 14 of the Electricity at Work Regulations permits dangerous work on or near exposed live conductors only if all three conditions are met: it is unreasonable in all the circumstances for the conductor to be dead; it is reasonable to work on or near it while live; and suitable precautions prevent injury. Commercial convenience, lost production or a claim of no alternative is not enough.

Competent assessment and planning must consider how to avoid live work and control the remaining hazards, including arc flash and stored energy. Other countries have different legal wording. This chapter is revision material, not authorisation or a complete procedure for live electrical work.

The precautions should have been identified in the risk assessment. It is not always possible to follow one rigid procedure for every situation, but the following precautions must be followed:

The most common live working activity is testing, typically carried out as part of routine preventive maintenance, diagnostic testing, product testing, commissioning or fault finding. Guidance on safety during electrical testing is in INDG354, Safety in electrical testing at work.

Isolation

An isolation procedure is a set of predetermined steps to follow when workers have to carry out tasks such as inspection, maintenance, cleaning or repair on an electrical system. Its aims are to:

The main steps of an isolation procedure are:

1Prepare2Notify3Shut down4Isolate5Lock and tag6Control stored energy7Verify isolationProve dead competently8Do the task9Make safe and restore
Figure 11.7 Isolation steps
  1. Prepare. Plan the job and identify every energy source.
  2. Notify. Tell everyone affected that the equipment is to be shut down.
  3. Turn off or shut down. Stop the equipment by its normal controls.
  4. Isolation. Disconnect it from every energy source.
  5. Apply locks and tags. Lock off the isolation points and attach tags.
  6. Control stored energy. Release, discharge, restrain or otherwise safely control pressure, gravity, electrical and other stored energy using the assessed method.
  7. Verify the safe state. A competent person must use the correct method and suitable equipment to prove dead and verify isolation. Trying the start button alone is not proof of electrical isolation.
  8. Perform the task.
  9. Make safe, inspect and restore. First confirm people and tools are clear, safeguards reinstated and linked work complete. Remove locks and tags only through the authorised release procedure, notify affected people and restore energy in a controlled way.